You may also enjoy
Installing Docker 2022 Semester 2
Here are installation instructions for installing Docker and running the software required for ELEC3608 Computer Architecture.
Trans-Tasman Low-Band Contest
Photos from the Manly Warringah Radio Society setting up in the Berrima Scout Hall for the Trans-Tasman Low-Band Contest.
Bodangora Wind Farm
Visited the Bodangora Wind Farm, owned by Iberdrola Australia (wikipedia entry here. It is located near Dubbo, has 33 turbines and capacity of 113.2 MW.
Tap Seat Refacing to Fix Dripping Tap
How hard could it be to fix a dripping tap? I’ve been battling with this one in my mother’s kitchen for several decades.