You may also enjoy
Installing Docker 2022 Semester 2
Here are installation instructions for installing Docker and running the software required for ELEC3608 Computer Architecture.
Boat maintenance links
Some links about boat maintenance.
Trans-Tasman Low-Band Contest
Photos from the Manly Warringah Radio Society setting up in the Berrima Scout Hall for the Trans-Tasman Low-Band Contest.
Bodangora Wind Farm
Visited the Bodangora Wind Farm, owned by Iberdrola Australia (wikipedia entry here. It is located near Dubbo, has 33 turbines and capacity of 113.2 MW.